
Services
Eight ways we service a hotel.
01 · Pre-construction
Pre-construction, before it is priced
We help shape the job before the bid, so the number holds once work starts.
- 01
PIP analysis
What the brand is asking for, what it will take, and what can be sequenced.
- 02
Scope and budget development
A defined scope and a budget built from it, not the other way around.
- 03
Value engineering
Alternatives that hold the brand standard and bring the cost down.
- 04
Permit management
Drawings through the building department, inspections through to final.
- 05
Furniture and fixtures coordination
Deliveries, storage and install timed to each phase.
02 · Phasing
Occupied-hotel phasing
Renovation sequenced around a hotel’s revenue and guest needs. We model the options before work starts, so the owner decides how to manage the impact.

03 · Brand programs
PIP and FRCM brand programs
Marriott calls it a PIP. Hilton calls it an FRCM. We work inside both, to the date the brand set.

04 · Conversions
Brand conversions and repositioning
A new flag or a new market segment. Exterior, lobby, guestrooms and back of house delivered as one program, like The Pierside, taken from a Wyndham to an independent boutique hotel.

05 · Model rooms
Model rooms and prototype approval
The model room and corridor prototype let the owner, architect and brand adjust and improve the design, so the final plan sets the standard before the full renovation.

06 · Programs
Multi-property programs
One standard across an owner’s portfolio. Consistent detailing, one point of accountability, and no separate negotiations.

07 · Independent
Independent and boutique hotels
The standard gets set with the owner instead of handed down by a franchisor.

08 · Service
Service and repairs
Emergency call-outs, small repairs, make-ready and cap-ex. We continue to service the property before and after the renovation.
